I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 9:50 am
by chumley
https://www.azdot.gov/media/News/news-r ... -i-40-i-17
Of primary concern to most HAZ users is that northbound I-17 will be repaved on the 30 miles south of Flagstaff. If you make weekend trips up north this summer, this could cause delays during peak traffic times.
Also worth noting is that the projects on I-40 west of Flagstaff will reduce traffic to 1-lane in each direction all summer long. Hikers heading to Grand Canyon may opt for US180 from Flagstaff instead of I-40 to AZ64 via Williams.
All the projects are scheduled to be completed by fall 2018, but even ADOT acknowledges this is unlikely to be the case!

Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 10:58 am
by azbackpackr
On. 40 I believe they are going to continue the big project of repaving with cement instead of asphalt. Much of this will be west of Williams. What was done last year is a stretch of east-bound just west of WIlliams. It is truly amazing pavement and I look forward to its completion. As a river shuttle driver I will be traveling through there often to go to Diamond Creek. But this year it's going to be very slow.
Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 11:04 am
by chumley
What you believe can either be confirmed or refuted by published data available in the link I included in the original post!
Each project has it's own specific information too (also found in that link):
https://www.azdot.gov/projects/northcen ... dan-paving
https://www.azdot.gov/projects/northcen ... ams-paving
https://www.azdot.gov/projects/northcen ... rks-paving
Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 11:35 am
by azbackpackr
@chumley
Okay well I will look at the links when not on phone. What I saw two days ago was work being readied, batch plant middle of freeway, signs up just east of Ash Fork saying work to begin this week.
And if you haven't driven that eastbound stretch by Devil Dog Road, check it out.
Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 12:00 pm
by azbackpackr
@chumley
Okay on laptop. Yes, cement for the Williams to Devil Dog section. One hopes that they would have plans to do the whole freeway in cement, but for Parks to Riordan it doesn't specify cement, whereas for that Devil Dog area it does. Thanks for the links. We should change your name to "Linkley."
Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 1:32 pm
by Jim
First, let me take this opportunity to mention how much I don't miss living in Flagstaff! I don't!
Second, I'll say I'm glad that the I-17 ramp closure should over by the time I visit.
Last, I am glad that I decided months ago to go to the Whites before I visit the Peaks this June or summer. Also, I believe the road will be paved in gold, due to the costs. Gold surfacing with Ivory guard rails.
Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 1:34 pm
by amy1300
@azbackpackr
We should change your name to "Linkley."
Wouldn't that be Linkopelli, on HAZ?

Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 1:42 pm
by chumley
If I can get people to read and research before posting rumors and unsubstantiated stories from social media, all y'all can call me whatever the

you want! And the whole world will be better off for it!

Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 2:24 pm
by azbackpackr
@chumley
Oh, but I was posting from Direct Experience, having seen the signs on I-40 for several weeks. "Construction will begin April 2." And last late summer we got stuck in the one hour delay, same place, while they were doing the eastbound lanes.
Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 2:28 pm
by Jim
Gold is very expensive. It is also smooth and shiny, and I prefer to a hot asphalt surface.
Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 3:06 pm
by big_load
azbackpackr wrote:Construction will begin April 2
Are the dates on those signs more reliable in AZ than elsewhere? We're lucky if they're within a year of the actual start.
Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 03 2018 6:42 pm
by azbackpackr
@big_load
I am not sure. I probably won't be driving that way for at least three weeks. I'll post here if delays are significant.
Re: I-17 & I-40 Flagstaff area construction summer '18
Posted: Apr 04 2018 9:28 am
by hikeaz