![]() |
Arriving at the high ridge, 400ft above the Furnace Mine complex: Interesting obsolete machinery - the winch drum and engine of the cable-way which were used to literally drag supplies up from the 4x4 road on the far side of this ridge, which were then lowered down the other side to the mine complex;
Feb 12 2010