It looks like there will be a 2+ year road work project on Highway 260 between the Rim Road and Heber
https://azdot.gov/projects/northcentral ... ibson-road
Highway 260 Road Work
Moderator: HAZ - Moderators
Linked Guides none
Linked Area, etc none
-
DixieFlyerGuides: 99 | Official Routes: 96Triplogs Last: 2 d | RS: 761Water Reports 1Y: 22 | Last: 16 d
- Joined: Jan 07 2017 7:03 am
- City, State: Fountain Hills, AZ
Highway 260 Road Work
Civilization is a nice place to visit but I wouldn't want to live there
contribute to this member driven resource
ie: RS > Save/Share after hikes


-
big_loadGuides: 0 | Official Routes: 1Triplogs Last: 594 d | RS: 3Water Reports 1Y: 0 | Last: 2,483 d
- Joined: Oct 28 2003 11:20 am
- City, State: Andover, NJ
Re: Highway 260 Road Work
I've only been on that road once when there wasn't construction.DixieFlyer wrote:It looks like there will be a 2+ year road work project on Highway 260 between the Rim Road and Heber
contribute to this member driven resource
ie: RS > Save/Share after hikes


-
DixieFlyerGuides: 99 | Official Routes: 96Triplogs Last: 2 d | RS: 761Water Reports 1Y: 22 | Last: 16 d
- Joined: Jan 07 2017 7:03 am
- City, State: Fountain Hills, AZ
Re: Highway 260 Road Work
@big_load
I guess that I have just been lucky, but it looks like my good luck is about to run out!
I guess that I have just been lucky, but it looks like my good luck is about to run out!
Civilization is a nice place to visit but I wouldn't want to live there
contribute to this member driven resource
ie: RS > Save/Share after hikes


-
big_loadGuides: 0 | Official Routes: 1Triplogs Last: 594 d | RS: 3Water Reports 1Y: 0 | Last: 2,483 d
- Joined: Oct 28 2003 11:20 am
- City, State: Andover, NJ
Re: Highway 260 Road Work
Once I was the last car in alternating traffic and I got to carry the flag. It was the first time I'd seen that method of control.
contribute to this member driven resource
ie: RS > Save/Share after hikes


-
NighthikerGuides: 0 | Official Routes: 0Triplogs Last: 1,415 d | RS: 0Water Reports 1Y: 0 | Last: never
- Joined: Feb 03 2002 6:59 am
- City, State: Payson
contribute to this member driven resource
ie: RS > Save/Share after hikes


-
azbackpackrGuides: 27 | Official Routes: 23Triplogs Last: 77 d | RS: 0Water Reports 1Y: 0 | Last: 770 d
- Joined: Jan 21 2006 6:46 am
- City, State: Eagar AZ
Re: Highway 260 Road Work
@Nighthiker
Me, too.
Me, too.
There is a point of no return unremarked at the time in most lives. Graham Greene The Comedians
A clean house is a sign of a misspent life.
A clean house is a sign of a misspent life.
contribute to this member driven resource
ie: RS > Save/Share after hikes


-
Alston_NealGuides: 1 | Official Routes: 0Triplogs Last: 106 d | RS: 0Water Reports 1Y: 0 | Last: never
- Joined: Apr 19 2008 5:53 pm
- City, State: Phoenix, AZ
Re: Highway 260 Road Work
Was gonna do Willow Springs at Sinkhole TH. Got stuck just below the rim for over half an hour. So close yet so far. Decided to pull off at Woods Cyn. lest risk dying turning left after all the ahole hounds got released. It turned out to be great day hiking after I mentally cleansed myself of my fellow Mericans. Five weeks ago they were just getting the prelim done, the road work seems to be in full force now.
contribute to this member driven resource
ie: RS > Save/Share after hikes


-
hikeazGuides: 6 | Official Routes: 0Triplogs Last: 1,010 d | RS: 0Water Reports 1Y: 0 | Last: 1,010 d
- Joined: May 13 2002 10:07 am
- City, State: Tempe, AZ
- Contact:
Re: Highway 260 Road Work
Motorists traveling on State Route 260 between Heber-Overgaard and Payson should plan for daytime delays of up to 30 minutes for the next five months as the Arizona Department of Transportation works on a roadway safety improvement project.
The project will require crews to narrow the highway to a single lane east of Christopher Creek, with work scheduled Mondays through Thursdays from 5 a.m. to 5 p.m. Restrictions are scheduled to begin Monday, Aug. 8 and continue through Dec. 30 roughly between Old Rim Road and Aspen Lane, which is from mileposts 282-305
Crews will narrow one mile of the highway at any given time during the project.
The $24.9 million project will improve safety along a 21-mile stretch of SR 260 by widening the shoulders on both sides of the highway. The project, in conjunction with the Federal Highway Administration, will also include guardrail improvements, better drainage, spot pavement repairs and restriping the roadway.
During work hours, flaggers and a pilot car will guide drivers through the work-zone, where the speed limit will be reduced to 25 mph. A 14-foot (width) vehicle restriction will be in place, while wider loads can be accommodated with 12 hours notice.
The project will require crews to narrow the highway to a single lane east of Christopher Creek, with work scheduled Mondays through Thursdays from 5 a.m. to 5 p.m. Restrictions are scheduled to begin Monday, Aug. 8 and continue through Dec. 30 roughly between Old Rim Road and Aspen Lane, which is from mileposts 282-305
Crews will narrow one mile of the highway at any given time during the project.
The $24.9 million project will improve safety along a 21-mile stretch of SR 260 by widening the shoulders on both sides of the highway. The project, in conjunction with the Federal Highway Administration, will also include guardrail improvements, better drainage, spot pavement repairs and restriping the roadway.
During work hours, flaggers and a pilot car will guide drivers through the work-zone, where the speed limit will be reduced to 25 mph. A 14-foot (width) vehicle restriction will be in place, while wider loads can be accommodated with 12 hours notice.
"The censorship method ... is that of handing the job over to some frail and erring mortal man, and making him omnipotent on the assumption that his official status will make him infallible and omniscient."
George Bernard Shaw
George Bernard Shaw
contribute to this member driven resource
ie: RS > Save/Share after hikes


-
NighthikerGuides: 0 | Official Routes: 0Triplogs Last: 1,415 d | RS: 0Water Reports 1Y: 0 | Last: never
- Joined: Feb 03 2002 6:59 am
- City, State: Payson
Re: Highway 260 Road Work
@hikeaz
This has not been listed on az511, the repaving on 87 Southbound South of Sunflower has not been listed.
This has not been listed on az511, the repaving on 87 Southbound South of Sunflower has not been listed.
jk
contribute to this member driven resource
ie: RS > Save/Share after hikes


-
hikeazGuides: 6 | Official Routes: 0Triplogs Last: 1,010 d | RS: 0Water Reports 1Y: 0 | Last: 1,010 d
- Joined: May 13 2002 10:07 am
- City, State: Tempe, AZ
- Contact:
Re: Highway 260 Road Work
@Nighthiker Be sure to have the "Roadwork" box checked....both situations are noted https://az511.gov/ Zoom in for detail
"The censorship method ... is that of handing the job over to some frail and erring mortal man, and making him omnipotent on the assumption that his official status will make him infallible and omniscient."
George Bernard Shaw
George Bernard Shaw
contribute to this member driven resource
ie: RS > Save/Share after hikes


-
chumleyGuides: 94 | Official Routes: 241Triplogs Last: 5 d | RS: 65Water Reports 1Y: 78 | Last: 7 d
- Joined: Sep 18 2002 8:59 am
- City, State: Tempe, AZ
Re: Highway 260 Road Work
@Nighthiker You can sign up for email notifications if you prefer: https://content.govdelivery.com/account ... ns/326b7f4 (Or just check the most recent releases here: https://azdot.gov/adot-news)
ADOT regularly updates their twitters and facebooks as well.
ADOT regularly updates their twitters and facebooks as well.